News

Bengaluru Power Cut Alert! BESCOM Announces Outage on March 2 – Affected Areas & Timings

BESCOM has announced a scheduled power outage in Bengaluru on March 2, 2025, affecting multiple areas due to maintenance work. The affected locations and timings vary, so residents should plan ahead. Learn how to prepare, which areas are impacted, and how to mitigate inconvenience. For real-time updates, visit BESCOM’s official website.

By Praveen Singh
Updated on
bengaluru-power-cut-alert-bescom-outage-march-2-affected-areas-timings

Bangalore Electricity Supply Company Limited (BESCOM) has announced a scheduled power outage in Bengaluru on March 2, 2025, due to maintenance and infrastructure upgrades. Power cuts are expected to impact various parts of the city at different times.

Power outages can be frustrating, but they are necessary for maintaining the city’s electricity network. Whether you work from home, run a business, or simply need electricity for daily tasks, knowing when and where the outages will occur is essential for planning ahead.

Also Check: Big Shock Before Holi! New Government Order for Ration Card Holders – Check Full Details

Affected Areas & Power Cut Timings

BESCOM has divided the outage into different time slots based on location:

North Bengaluru (9:00 AM – 2:00 PM)

  • Areas affected: Hebbal, Yelahanka, RT Nagar, Sanjaynagar, Jakkur, Vidyaranyapura
  • Advice: If you rely on electricity for work or daily chores, complete critical tasks before 9 AM.

South Bengaluru (10:00 AM – 3:00 PM)

  • Areas affected: Jayanagar, JP Nagar, Banashankari, Basavanagudi, Kumaraswamy Layout
  • Advice: Keep backup lighting ready and avoid scheduling meetings during this period.

East Bengaluru (8:30 AM – 1:30 PM)

  • Areas affected: Whitefield, Marathahalli, KR Puram, Mahadevapura, Indiranagar, Bellandur
  • Advice: Businesses in tech hubs like Whitefield should plan alternative power arrangements.

West Bengaluru (11:00 AM – 4:00 PM)

  • Areas affected: Rajajinagar, Vijayanagar, Nayandahalli, Magadi Road, Kengeri, Nagarbhavi
  • Advice: Consider working from locations with a reliable power backup if necessary.

Why is BESCOM Conducting These Power Cuts?

Power outages like these are part of planned maintenance to:

  • Upgrade electrical infrastructure.
  • Prevent unexpected power failures.
  • Ensure safety by replacing aging power lines and transformers.
  • Support the increasing demand for electricity.

These outages help prevent major electrical failures in the future, ensuring that Bengaluru’s power grid remains stable and efficient.

Also Check: MP’s New Railway Line: 17 Stations & 3 Districts to Benefit – Big Infrastructure Boost!

How to Prepare for the Power Outage?

Here are some practical steps to minimize inconvenience:

1. Charge Your Devices

  • Ensure that mobile phones, laptops, and tablets are fully charged.
  • If you work remotely, keep a power bank handy.

2. Store Water in Advance

  • Many apartments rely on electric pumps for water supply.
  • Store enough water for drinking, cooking, and other essential uses.

3. Keep Backup Lighting

  • Use emergency lights, battery-powered torches, or candles.
  • Charge rechargeable lights before the outage.

4. Plan Your Work Schedule

  • If possible, schedule meetings and important work outside the power cut hours.
  • If you work from home, relocate to a café or co-working space with backup power.

5. Protect Your Electronics

  • Unplug sensitive devices (TV, computers, refrigerators) to prevent voltage fluctuations when power is restored.
  • Use a surge protector for critical electronics.

6. Use Alternative Power Solutions

  • Inverters or generators can help for short outages.
  • If you run a business, consider a backup UPS system for continuity.

7. Identify Alternative Workspaces

  • Coworking spaces and certain cafés offer power backup and WiFi.
  • Some offices may allow employees to work from alternative locations.

8. Stay Updated

  • Follow BESCOM’s official website for any last-minute changes.
  • Call BESCOM Helpline: 1912 for assistance.

Impact on Businesses and Residents

Businesses

  • Offices, restaurants, and retail outlets should plan ahead for backup power.
  • IT companies may face server downtime, so alternate arrangements are advisable.
  • Manufacturing units relying on electricity should reschedule critical tasks.

Households

  • Apartments relying on electric water pumps will need water storage.
  • Food storage in refrigerators may be affected; avoid perishable stock.
  • Cooking arrangements should be planned in advance.

Bengaluru Power Cut Alert (FAQs)

1. What should I do if the power cut lasts longer than expected?

If the outage extends beyond the scheduled time, contact BESCOM at 1912 or check their official website for updates.

2. Can I report a power failure if my area isn’t listed?

Yes. If you experience an unexpected power cut, report it through the BESCOM app or call the helpline.

3. How often does BESCOM conduct planned outages?

Planned outages occur periodically for maintenance, typically announced a few days in advance.

4. How can businesses minimize disruption?

Businesses should have backup power solutions, reschedule critical work, or allow remote work where possible.

Also Check: Big News for Dairy Farmers! Govt to Cover 75% Insurance Cost for Cattle – Check Details

Author
Praveen Singh
I'm a journalist based in India covering politics, social issues, and current affairs. I write clear, balanced stories to keep readers informed and engaged.

Leave a Comment